Plan A
Rough dimensions of Plan A: 128.08 yard length, 13.96 yards width Rough area of Plan A: 1786.88 yards squared or 16081.92 feet squared Rough cost of Plan A: concrete low end: $51,839 concrete high end: $55,957 asphalt: $35,593 Plan B Rough dimensions of Plan B: can not be easily shown Rough area of Plan B: 924.9786 yards squared or 8324.8074 feet squared Rough cost of Plan B: concrete low end: $26,873 concrete high end: $29,048 asphalt: $18,424 Plan C Rough dimensions of Plan C: 13.49 yards length 81.94 yards width Rough Area of Plan C: 1105.376 yards squared or 9948.384 feet squared Rough cost of Plan C: concrete low end: $32,099 concrete high end: $34,689 asphalt: $22,018 |
|
Differences between asphalt and concrete: Concrete Pros: longer life, fewer repairs are needed, more resistant to weather, not damaged by oil leaks Concrete Cons: More expensive to lay, more expensive to repair, harder maintenance _____________________________________________________________ Asphalt Pros: Cheaper to lay, cheaper repairs, easier to repair, and better grip for tires Asphalt ConsP: Short life, more repairs needed, and damaged by oil. |